Open engineering

Find the rightmachine beforerequesting a quote

Four tools with the same logic our engineering team uses every day. The result comes with the model from our real production table, with no guesswork and no mandatory registration.

  • Sizing by material, distance and discharge height
  • Real models from the ETD, EV, ETH, ER and RTC lines
  • Payback calculation with the assumptions visible on screen

Tool 01

Conveyor sizing tool

Enter the material, the distance between loading and unloading and the height you need to reach. We return the approximate conveyor length, the incline, the recommended belt and the model from our table.

Your operation

6.0 m
2 m30 m
2.5 m
0 m12 m

Engineering recommendation

Belt Conveyor for Bags

Required length

6.5 m

Incline

23°

Recommended model

ETD8

Motor

2 cv

Belt / screw

0,5 m

Capacity

70 kg/m

Reference values from our factory tables. Final confirmation is made by our engineering team with your line data.

Tool 02

Visual configurator

Adjust length, incline and equipment line. The technical drawing redraws in real time, with the belt running, so you can see the machine before asking for the proposal.

3.0 m8.0 m

Schematic drawing at approximate scale, just for you to see how it fits in the layout.

8.0 m
3 m25 m
22°
0°35°

Model

ETD8

Discharge height

3.0 m

Motor

2 cv

Belt

Cleated belt

Tool 03

Is it worth automating?

Compare the cost of moving loads by hand with the gain from a conveyor. All assumptions are visible: change any number and see the effect right away.

How your operation is today

Assumptions used in the calculation, in plain sight: manual handling of 180 volumes per hour per person and conveyor at 2,000 volumes per hour (belt at 40 m/min, one volume every 1.2 m). Adjust the fields with the real numbers of your operation.

What changes with mechanization

Savings per month

R$7,600

Savings in 12 months

R$91,200

Estimated payback

enter the investment

Hours/month freed up

23 h

Monthly labor cost on this task

Today, per monthR$15,200
  • Savings with the conveyorR$7,600−50%
  • Cost that remainsR$7,600
Daily time on the task1.7 h manual → 0.6 h with conveyor
Volumes per year316,800
Labor cost per volumeR$0.58 → R$0.29

Default assumptions: 180 volumes per hour per person in the manual process and 2000 volumes per hour with a conveyor. These are reference values from operations similar to yours. Adjust them to your case. The investment is optional and only enters the calculation when you inform it, because the price depends on the project.

Tool 04

Guided recommendation

Five quick questions about your operation and we recommend the most likely equipment, with the points of attention for the project.

Question 1 of 5

What do you handle?

This defines the equipment family.

The tool recommended the equipment. Now let's move to the project.

Send the result shown on screen together with the material and layout of your operation. Our engineering team validates the sizing and returns the proposal with the manufacturing lead time.

(19) 3033-9397 · (19) 99884-2717 · vendas@demakine.com.br